After significant flooding damaged the Berkeley Lake Dam, CPL was called to evaluate the damage and manage the repair process. Repairs to the dam included the replacement of the existing internal drain system, the flattening of the downstream slope to add stability, and the addition of a low level drain to meet the Safe Dams Program requirements.