A major part of the East Irondequoit Central School District’s Generational Project consisted of substantial renovations to Eastridge High School. Work included the design of a brand-new gymnasium, an 8-lane, 25-meter pool, a full-sized, main competition field with an 8-lane track, baseball and softball fields, and tennis courts. The school’s cafeteria and food preparation stations were also upgraded, and a new transportation facility was constructed.