To provide water storage to better fit the needs of the City of Poughkeepsie, CPL designed two concrete water storage tanks, each with a 2.5 million gallon capacity, near existing reservoirs.
Completed
2019
Total Project Cost
$5.5 M
Services
Civil/Site Engineering