M/E/P Solutions – Maximizing Building Systems for Health and Safety

The COVID-19 pandemic has identified several building systems that should be considered for improvements, modifications or replacement. The first and foremost concentration of review should be the building’s mechanical and electrical systems. These systems provide the infrastructure to sustain your daily operations, and are the principal drivers of both comfort and life safety in the indoor environment. CPL is prepared to provide professional recommendations for short-term building and system improvements, as well as longer term planning and renovation projects.

Click here to learn more

Dave is a Vice President, accomplished mechanical engineer, and the Lead M/E/P Engineer here at CPL. He supports and directs the work of the mechanical, electrical and plumbing engineering staff, while continually "raising the bar" when it comes to the implementation of new technologies advancing the design process.